PXL_20250318_163457777

Spray Foam- 03/15/2025

Enhance energy efficiency and comfort with spray foam insulation. Ideal for temperature control, noise reduction, and improving air quality in your indoor pickleball facility.

PXL_20250318_163814330

AC- 03/20/2025

Optimize comfort and air quality with multiple AC units and a humidity controller. Perfect for regulating temperature and maintaining ideal conditions in our indoor pickleball facility.

PXL_20250318_163625466

Electrical- 03/22/2025

Tyler Indoor Pickleball is equipped with state-of-the-art electrical systems, low-voltage blacklights, high-quality speakers, and advanced video cameras, providing an optimal experience for players and enhancing ambiance and security

 
Construction-Progress-Aerial-View

Roof- 03/02/2025

The completion of the metalwork marks a significant milestone. Strong frameworks now stand as symbols of progress, paving the way for the next project phases.

Construction-Progress-Building-Top-View

Cladding & AC- 03/02/2025

Setting up the AC system ensures comfort and functionality. Precision and careful planning define this stage, creating an efficient environment that enhances the building’s practicality and purpose.

construction-progress-industrial-building

Cladding Completed- 03/02/2025

With doors installed, the focus shifts indoors. Attention now turns to crafting interior spaces, transforming the structure into a fully functional and inspiring environment.

 
construction-progress-industrial-building

Cladding- 01/16/2025

Cladding requires precision and artistry. Each panel is meticulously placed, ensuring durability and beauty. This process transforms the structure’s exterior into a protective and elegant masterpiece.

02f831a9e288711406a0f1f5ecd9c56d93140bb6

Cladding- 01/16/2025

Roof construction demands skill, focus, and resilience. Weather challenges, intricate designs, and heightened workspaces push the team’s expertise, creating a strong, secure layer to crown the building.

construction-progress-metal-building

Cladding- 01/16/2025

Cladding and roofing combine to define the structure’s strength and character. Together, they symbolize teamwork and craftsmanship, finalizing a project built on dedication and shared vision.

 
construction-progress-foundation-frame work

Erection Completed- 01/08/2025

The building’s massive scale astounds, a towering marvel of engineering with incredible dimensions. Its bold design and sprawling framework showcase human ingenuity and architectural brilliance.

construction-progress-steel-framework

Erection Completed- 01/08/2025

Finishing touches polished the structure into perfection. Every detail, inside and out, reflects precision and craftsmanship, transforming raw materials into a masterpiece that’s as elegant as it is functional.

construction-progress-building-frame work

Erection Completed- 01/08/2025

Celebrating this milestone, we honor the teamwork and dedication behind it. Countless hours and relentless passion brought this vision to life, creating something truly extraordinary together.

 
construction-progress-foundation-frame

Erection - 12/30/2024

Erecting a structure of this magnitude is no small feat. It demands unmatched expertise, precise teamwork, and relentless effort to achieve something truly remarkable.

 
construction-progress-steel-frame

Erection - 12/30/2024

Putting up the walls was no easy task. It demanded exceptional skill, tireless effort, and coordinated teamwork to conquer the challenges and make progress.

 
construction-progress-foundation-frame work

Erection - 12/30/2024

Having all the walls up marks incredible progress. This achievement bring this part of the project closer to completion.

 
construction-progress-foundation-prep

Steel Delivered- 12/16/2024

Waiting 10 days for the concrete to dry tested our patience and planning. This crucial step ensured a solid foundation before delivering the steel for the project.

construction-progress-foundation-overview

Steel Delivered- 12/16/2024

Placing all the beams in their precise locations is vital for structural integrity. This critical step ensures the entire construction process stays safe, stable, and efficient.

 
Construction Progress – Foundation

Steel Delivered- 12/16/2024

The moment the steel was delivered, our team got to work immediately. Their efficiency and dedication were key to keeping this project on schedule.

 
construction-progress-pour

Concrete- 12/06/2024

The massive footers on this project are astounding, requiring an extraordinary amount of dirt work. Their impressive size showcases the grand scale of our efforts.

construction-progress-pour-2

Concrete- 12/06/2024

The concrete pump had to cover an enormous area, pushing its limits. Tackling such a large-scale project demanded precision, coordination, and careful planning from the team.

construction-progress-pour-3

Concrete- 12/06/2024

Pouring hundreds of yards of concrete in one day was a massive challenge. We appreciate the concrete company pausing operations to celebrate Tyler Pickleball Day!

construction-progress-arial-photo

Dirt Work - 9/13/2024

Managing such a large-scale dirt work project brought immense challenges. The complexity and scope were overwhelming.

construction-progress-arial-work-photo

Sky - 9/13/2024

The transformation achieved through our dirt work is remarkable. Our dedicated team worked tirelessly, though unforeseen hurdles made the project more challenging.

construction-progress-dirtwork

Sky - 10/10/2024

The immense scale of our dirt work, captured beautifully from above, showcases our efforts. This project taught us important lessons about balancing ambition with management.

Â